Server cabinet selection key
Security Level Requirements for Data Centers
With respect to a data center that is very important, the mission
of the personnel is to ensure that IT equipment runs 24/7, and any
unexpected downtime will result in significant losses. Then, when
selecting a server cabinet, it is necessary to consider the
reliability and the convenience of protection. Therefore, it is
necessary to select products with hot-swappable components and a
variety of monitoring and lightning protection devices. The barrier
transformer can be used as an option, based on data center
electrical The system architecture and the ratio of diesel engine
units are optional. For a data center with a low importance, you
can choose the monitoring system with the general components and
the simpler can be
The degree of automation of data centers
With regard to server racks in data centers, there is a need for
regular preventive inspections to keep the cable joints fastened
and insulated. If the data center is of a large scale, it is
necessary for the handling personnel to take the initiative in
progress management. Then when selecting products, the need to
collect as much data as possible, strengthen monitoring, in order
to improve the equipment processing power, reduce the frequency of
on-site viewing. The server cabinet is equipped with necessary
analysis data and active alarm functions. It can provide alarm
information in accordance with the rules of the booking, and it can
also improve the inspection power.
The demand for energy power in data centers
In the computer room where IT devices are densely deployed, there
is often an imbalance in three-phase currents, which results in the
dross of energy. A data center with an annual electricity bill of
several tens of millions of dollars, if the three-phase current is
unbalanced, loses 1% of the energy, which is also a considerable
cost. Therefore, a cabinet commodity that has a convenient
adjustment phase is selected. Even if the initial investment is
large, it is possible to save the cost and gradually withdraw the
capital in the ordinary processing.
![]() |