Sign In | Join Free | My himfr.com |
|
Ask Lasest Price | |
Brand Name : | YUHUI |
Model Number : | Electromagnetic isolation Net Rack Cabinet Heat ventilation YH02 |
Certification : | ISO9001 |
Price : | negotiable |
Payment Terms : | L/C, T/T, Western Union, MoneyGram |
Supply Ability : | 10000 per week |
Delivery Time : | 10 work days |
Temperature control system
The interior of the cabinet has a good temperature control system
to avoid overheating or overcooling of the products inside the
cabinet to ensure efficient operation of the equipment. The cabinet
can be fully ventilated and can be equipped with a fan (fan life
guarantee). In a hot environment, an independent air conditioning
system can be installed. In a cold environment, an independent
heating and insulation system can be installed.
Anti-interference and other
A full-featured cabinet should provide all kinds of door locks and
other functions, such as dust-proof, waterproof or electronic
shielding and other high-disturbance performance; at the same time
should provide suitable accessories and mounting accessories
support, so that the wiring is more convenient, and easy to manage
,save time and energy.
Service
The effective services provided by enterprises and the
comprehensive equipment protection programs provided by them can
bring great convenience to users' installation and maintenance.
In addition to taking into consideration the above points, the
cabinet solution in the data center should also consider the design
of the cable layout and power distribution in order to ensure the
system's good operation and upgrade convenience.
Distribution System
How do racks respond to rising power densities? With the increasing
trend of IT high-density installations in racks, and whether the
racks can be used effectively, the distribution system becomes the
key link. Reasonable power distribution is directly related to the
availability of the entire IT system, and it is an important basic
link for whether the entire system can exert its effective
capability. This is also a problem that has been neglected by many
computer room managers in the past. Due to the ever-smaller IT
equipment, the density of equipment installation in the cabinet is
increasing. Take a 7U blade server as an example. One set needs
about 3kVA of power distribution, while a 42U-high cabinet may
install up to 8 of them. The total power demand of the servers will
reach 24kVA. This poses a serious challenge to the distribution
system in the cabinet. At the same time, the increase of input and
output ports also puts high demands on the reliability of
distribution system installation.
The design of a reasonable cabinet power distribution system should
follow the principle of reliability design as the core,
specifically designing for the cabinet system, fully coordinating
with the distribution system, and seamlessly cooperating with it.
At the same time, the convenience of installation and intelligent
management should be considered. , adaptability, easy operation and
maintenance and so on. The power distribution system of the cabinet
should make the power supply closer to the load to reduce the
points of failure in the power path. At the same time, local and
remote monitoring of load currents and remote control of power
distribution should be gradually implemented so that power
distribution management can be integrated into the overall
intelligent management system of the equipment room.
![]() |